West Brampton Reservoir & P/S. P/S under construction.
The $39M main project + $5M for the Transmission Main included
- 2 cells 38,000cm reservoir
- Valve House
- Pumping station and STBY generator building
|
|
|
Reservoir during construction.
|
|
Outside the P/S.
|
|

|
Inside the P/S.
|
Mid Halton WWTP $39M Expansion - Oakville
2 Secondary clarifiers
2 Aeration tanks
modification to a digester
Blower building
Grit tank
Modifications to existing Inlet building: additional screening equipment,grit collectors, classifiers
Biosolid building including: de-watering centrifuge system, Rotary Drum Thickeners system, odour control system, RAS & WAS systems, polymer systems, solid handling equipment, shaftless screw conveyors
|
|
|
Mid Halton - Biosolid building
|
| Mid Halton - De-watering/Thickening area
|
|
|
Mid Halton - RDTs system
|
| Mid Halton - Centrifuges system
|
|
|
Mid Halton - Biosolid loading tanks
|
| Mid Halton - Aeration tanks & Blower building
|
|
|
Mid Halton - Grit tank & Inlet building
|
Oakville WTP - Ozone system. The $31M project included:
- Actiflo system
- Chemical systems for - PH control, ozone
quenching, de-chlorination, taste & odour control, coagulation,
fluoridation
- Reservoir
- LLPS/HLPS upgrade
- Administration upgrade
|
 |
 |
Oakville WTP - reservoir |
| Oakville WTP - Actiflo system |
 |
 |
Angus WWTP - Filter building. The project included:
Inlet, Grit & Administration buildings, Secondary P/S, Secondary
clarifier, Aeration tank & sludge P/S |
| Angus WWTP - Aeration tank |
 |
 |
Orillia WTP including reservoir, HL P/S, Administration section, Chlorine Contact Cells |
| View of the Main Pumps Room |
 |
 |
Barrie WPCC - Inlet, primary & secondary clarifiers |
Barrie WPCC;
Clarifier, Barrie.
|
|
|
Guelph WWTP;
Inside the ABW filter building, Guelph.
|
Guelph WWTP;
Plant #4 primary, aeration, and secondary tanks, Guelph.
|
|
|
Guelph WWTP;
Plant #4 aeration tanks - the Filter building in the background, Guelph.
|
|
Petticoat bridge.
|
|
|
Corbet Creek WPCP;
Biosolid Storage Facility, Whitby.
|
Corbet Creek;
Biosolid facility.
|
|
|
Non-Quon;
Water Pollution Control Plant,
Township of Port Perry.
|
Highland Creek Bridges;
Phase III, City of Scarborough.
|
|
|
South Sector Reservoir and Pumphouse;
Township of Orangeville.
|
Britannia Landfill;
Flaring Station, City of Mississauga.
|
|
|
Lester B. Pearson International Airport;
Runway, Taxiway, Toronto.
|
Lindsay WPCP;
Tertiary building, Lindsay.
|
|
|
Lindsay WPCP;
Inside the tertiary building (contains Actiflo & UV systems) Lindsay.
|
Lindsay WPCP;
Inside the Inlet building: Vortex & screen systems, Lindsay
|
|
|
Lindsay WPCP;
Secondary clarifier, Lindsay.
|
Lindsay WPCP;
Lindsay.
|
|
|
Shoalts Reservoir;
Pelham.
|
Duffins Creek;
Waterfront Bridges, Town of Ajax.
|
|